1. What services are typically provided by Alicia Ravetto Architect when designing a new residence or a renovation project?
Predesign (Defining the scope of work)
- Identify both the opportunities and constraints of the site/existing house
- Listen to the Owners’ ideas and expectations of their project
- Prepare a “program” for the house/site that describes desired types and sizes of rooms as well as the preferred relationships between individual rooms and the outdoors
- Develop a preliminary project budget
Schematic Design (Developing the Concept)
- Prepare initial design “schemes” or concepts via drawings and/or 3D models
- Refine the design until the Owners approve a design concept
- Update the budget
Design Development (Refining the Design)
- Refine the approved schematic design until a final design is approved
- Add detail and materiality to the approved design
- Update the budget
Construction Documents
- Prepare detailed Drawings and Specifications that describe the project and are referenced in the contract between the Owner and Contractor for the construction of the house.
Hiring the Contractor
- Assist the Owner in selecting the Contractor and negotiating a construction contract through a negotiation process or facilitate a bidding process.
Construction Contract Administration
- Oversee the construction work for conformance to Construction Documents, on an as needed basis
2. Do all residences include all of the services noted above?
Most do; however, I can adjust my services (and fees) to an Owner’s particular requirements.
3. Who is on the “team” when designing and building a home with Alicia Ravetto Architect?
The Owners and the Architect. Other design professionals such as a structural or civil engineer, interior designer, or a landscape architect are often involved in creating a new or renovation project but this will happen only after the Owner approves it.
4. How are your fees determined?
My fees are negotiated according to my role and level of service. I can structure the fee as a fixed amount, percentage of construction cost, or hourly rates – based on Owner’s needs. The house’s size, location, level of finish and other design factors affect the fees.